Indexed News on:

--the California "Mega-Park" Project

Tracking measurable success on preserving and connecting California's Parks & Wildlife Corridors

READ OUR EDITOR ON FACEBOOK: facebook.com/rex.frankel
Showing posts with label Tejon Ranch. Show all posts
Showing posts with label Tejon Ranch. Show all posts

Tuesday, March 24, 2015

Tejon Ranch and Onyx Ranch update

Urban Sprawl and Industrialization of Wilderness vs. Condors and other birds: the battle continues...

By Rex Frankel,

Dear Readers:

An issue we have followed very closely in the past has been attempts to connect the concrete sprawl of Los Angeles with the San Francisco Bay and Sacramento metropolises. Most active has been the desert and oil field County of Kern, home to Bakersfield.

The two largest landholdings at play in Kern are the 270,000 acre Tejon ranch and the 68,000 acre Onyx Ranch. I have covered them both quite extensively:

http://rare-earth-news.blogspot.com/search/label/Tejon%20Ranch

http://rare-earth-news.blogspot.com/search/label/Onyx%20Ranch




                                              CLICK ON MAP TO ENLARGE

Tejon's owners want to build around 30,000 homes in the mountains east of Frazier Park along the 5 freeway (the Grapevine) in three separate projects which straddle the San Andreas Fault. Two are in Kern County and the largest is proposed in L.A. County. The two Kern county projects have faced unanimous approval by Kern County's elected politicians. The L.A. County project, called Centennial, faces a less certain future. So far, the economic likelihood of the housing projects going up at Tejon is very low, as the far north L.A. County economy has yet to recover from the end of the Cold War in the 1990's.

Onyx Ranch, on the other hand, is a desolate desert wilderness east of the Sierra Nevada Mountains which is now going to be split between windmill farms on the south half and an off-road vehicle park on the north, surrounded by an existing federal dune buggy and motorcycle play zone called Jawbone.

Here is the latest on these projects from the web:


TEJON: 

7/17/2014
http://www.biologicaldiversity.org/news/press_releases/2014/california-condor-07-17-2014.html
Condor advocates, conservationists and American Indians this week notified the U.S. Fish and Wildlife Service they intend to sue over the agency’s approval of a “habitat conservation plan” that will destroy 14,000 acres of designated critical habitat for the California condor, one of the world’s most endangered birds. The habitat is entirely located on Tejon Ranch, north of Los Angeles, and will be destroyed by the development of the proposed Tejon Mountain Village resort project. Tejon Ranch encompasses some of the most important and essential foraging habitat for condors, much of it protected since 1977.

MORE INFO:
http://www.biologicaldiversity.org/campaigns/save_tejon_ranch/condor_controversy_history.html
                         
                         --------------------------------------------------------------

ONYX:

12/31/2014
Eastern Kern County Property Acquisition complete by State Parks Department for Off-Roader Park

BELOW: parcels in red were purchased by the State Parks Department. The parcels in gray to the south were kept by the landowner to be developed as windmill farms.


By Susan Barr / excerpted from the Kern Valley Sun


... the OHMVR Division hoped to acquire was approximately 28,275 privately-owned acres in eastern Kern County. The 59 parcels proposed for acquisition were largely interspersed in a checkerboard fashion, with the bulk of the land owned by the U.S. Bureau of Land Management (BLM), with some parcels adjoining the Sequoia National Forest or lands under other private or public ownership. (See Parcel Map.) The proposed project parcels were used primarily for off-highway vehicle (OHV) recreation, grazing, camping, wildlife viewing/birding, and other activities.


Motorized travel, including OHV recreation, occurs throughout much of the area, largely on designated roads and trails. A few of the project parcels were within the Jawbone Canyon open area, in which vehicles are not restricted to designated routes.
By acquiring the parcels, the OHMVR Division would be able to improve overall management of the area as land managers would have complete access to manage and support the recreational uses, protect sensitive resources, and restore and rehabilitate damaged areas...


Dan Canfield, Manager - Planning Office, OHMVR Division, out of Sacramento, confirmed yesterday in a telephone interview with the Sun, that the exchange of funds has taken place and escrow has been completed with regards to payment for land acquired for the East Kern Land Acquisition Project. The largest land owner was the Renewable Resources Group (RRG).

Canfield clarified that the process of Eminent Domain was not utilized, despite the fact that lengthy negotiations were required to come to a purchase price agreement with some of the land owners.


Canfield stated that he anticipates a seamless transition and that the focus will now be on assuring how lands in the acquisition can be conserved for future generations, while continuing recreational use as it has existed in the past. He added that the public should not expect to see new roads or trails becoming available.


http://ohv.parks.ca.gov/?page_id=27211
http://ohv.parks.ca.gov/pages/25010/files/nod_ekca-final-eir.pdf
Final approval document, 10/4/2013

http://www.jawbone.org/foj/



MORE ON THE NATURAL VALUES OF ONYX RANCH:

http://traenviro.com/experience/representative-projects/eastern-kern-county-property-acquisition-eir/
From east to west, the lands rise from the high floor of the western Mojave Desert into the southern Sierra Nevada and Piute Mountains. In general, the area is rugged and dominated by desert scrub habitat in the east and by woodland in the west. Unique biological resources include Butterbredt Spring, a significant migratory bird stopover site, habitat for listed species such as the desert tortoise, and a raptor migratory corridor between the Kern River Valley and the Mojave River. The lands are also rich in cultural resources. The area is used for motorized recreation, open range grazing, camping, wildlife viewing/birding, and other activities

Tuesday, May 1, 2012

dammit--Tejon ranch resort passes court test...

Crummy Court Ruling for California Condors

It appears that Tejon ranch has won the first big court battle over their plans to build 30,000 homes along the San Andreas fault at the extremely fragile wildlife migration pinchpoint between southern and Central California.


This shows the weakness of our state's main environmental law which requires revelation of impacts but then lets the government choose to ignore them (see story of our battle to save more of the Ballona wetlands where this law failed us: http://ballona-news.blogspot.com/2012/04/some-sad-news-yet-we-count-our.html )

Anyway, this battle for Tejon is far from over. This is because the federal government (headed by that pesky liberal Barack Obama) has yet to approve Tejon's permits to locate 3400 homes right in the middle of endangered species habitat, that of the huge and prehistoric-looking California Condor. The issuance of this permit, called a "take permit", because it would allow Tejon to kill wildlife by bulldozing their homes, has been sitting in limbo despite the issuance of massive reports by the developer three years ago.

In 2011, federal officials reported that the condor is all over and expanding its use of Tejon's dreamed-of mountain resort. So unless Obama caves in to the developers, the victory in state court is just one in a long war.

http://mountainenterprise.com/atf.php?sid=10191&current_edition=2012-04-20

MORE INFO:

http://mountainenterprise.com/atf.php?sid=9873¤t_edition=2012-02-10 
2/10/2012: FWS’ Root said no change has been made to the development footprint of Tejon Mountain Village. Radio telemetry and GPS mapping by the U.S. Geologic Survey confirmed last year that wild California condor are recolonizing the areas on which TRC and partner DMB Associates plan to build over 3,400 Tejon Mountain Village resort homes, condominiums, 700 hotel rooms, two golf courses and a commercial zone.

-------------------------------

2/2/2012 http://la.curbed.com/archives/2012/02/tejon_ranch_project_could_affect_27_plants_and_animals.php
 Tejon ranch—changes to alternatives in HCP

http://scvnews.com/?p=25770 http://www.the-signal.com/section/36/article/59286/

The public will be able to comment on the Supplemental Draft Environmental Impact Statement and the Draft Tehachapi Uplands Multi-Species Habitat Conservation Plan until May 3, 2012

http://mountainenterprise.com/atf.php?sid=9861¤t_edition=2012-01-27

The documents address critical habitat concerns for the endangered California condor, which has been shown with radio telemetry to be repopulating sections of Tejon Ranch which had previously been intended by the developers to be included in the Tejon Mountain Village resort community, hotels and commercial sectors. A draft environmental impact report (DEIR) for the 23,000 home Centennial project is also expected to be issued this year. http://www.fws.gov/ventura/newsroom/release.cfm?id=77

https://www.federalregister.gov/articles/2012/02/03/2012-2294/tehachapi-uplands-multiple-species-habitat-conservation-plan-kern-county-ca

 ------------------------

LAWSUIT STORIES:

http://turtletalk.wordpress.com/2012/04/30/california-appeals-court-declines-to-halt-tejon-ranch-development-cultural-resources/

http://tejonranch.com/press-release/appellate-court-upholds-tejon-mountain-village/

http://www.kget.com/mostpopular/story/Massive-Tejon-development-clears-legal-hurdle/6ocAO8LOBEur58KE0rzfbw.cspx

http://www.kget.com/news/local/story/Massive-Tejon-development-clears-legal-hurdle/6ocAO8LOBEur58KE0rzfbw.cspx

http://www.bakersfieldcalifornian.com/local/x768326129/Court-upholds-study-of-Tejon-development

-----------------------

FEDS DECLINE TO PROTECT A TEJON LIZARD:

10/7/11 Tehachapi slender salamander denied endangered species protection http://latimesblogs.latimes.com/greenspace/2011/10/tehachapi-slender-salamander-denied-endangered-species-protection.html On Friday, the service rendered its final conclusion: Batrachoseps stebbinsi does not warrant a spot on the endangered species list. An analysis determined that cattle grazing, road construction, flood control projects, disease, severe wildfires, prolonged drought and construction of Tejon Ranch’s proposed 7,860-acre residential and commercial development, the Tejon Mountain Village project, would not impact the species in the foreseeable future. The salamander resides in two canyons about 13 miles apart and separated by a freeway 60 miles north of Los Angeles.

----------------

http://www.the-signal.com/section/36/article/52336/

The species consists of two populations, the Tehachapi Mountains population and the Caliente Canyon population, which are separated from each other by dry, rugged, mountainous terrain. The range of the Tehachapi Mountains population is about 13 miles southwest of the Caliente Canyon population on property owned by Tejon Ranch and the California Department of Parks and Recreation at Fort Tejon State Historic Park. The Caliente Canyon population is located at the northeastern end of the Tehachapi Mountains, near the small community of Loraine. …Construction of the Tejon Ranch's proposed 7,860-acre residential and commercial development, the Tejon Mountain Village project, is not expected to be a substantial threat to the Tehachapi Mountains population of the salamander. The project does not overlap with areas where the species has been found or the areas that the Service considers to be occupied by the salamander. …An advance copy of the 12-month finding can be viewed online today at the Federal Register Public Inspection Page: http://go.usa.gov/924 . When the finding publishes in the Federal Register on October 11, it will be available at http://www.fws.gov/ventura or at http://www.regulations.gov. ----------------------------------

Thursday, July 28, 2011

Big Sierra's to Tejon Purchase is brewing...

Deal May Open the "Tollhouse" for Wildlife to Cross California

The link between the Sequoia National Forest and the Tejon Ranch conservation project may be purchased soon by the private Nature Conservancy with assistance by the taxpayers. The Tollhouse Ranch is 15,000 acres of oak trees and grasslands lying just north of the 58 Freeway a bit east of Bakersfield. Once saved, the Nature Conservancy plans on re-selling the land with complicated preservation deed restrictions to another buyer. This wildlife corridor is one of the most important in the State of California as it connects the Sierra Nevada mountains to the Angeles and Los Padres National Forests in L.A. and Ventura county, which have trail connections to the remaining undeveloped open spaces in Big Sur and San Diego. So saving this proerty is a really big deal.

I have written about the Sierras-to Tejon-to L.A. wildlife corridor battles here:
http://rare-earth-news.blogspot.com/search/label/Tejon%20Ranch

The sellers of this property are connected to the Rudnick family, which also recently sold another massive ranch further east to wind farm developers. For more on that deal:
http://rare-earth-news.blogspot.com/search/label/Onyx%20Ranch

Grasslands and blue oaks. Photo by E. J. Remson

TOLLHOUSE RANCH IS IN RED (BELOW)



SOME MORE DETAILS FROM THE INTERNET:

Rudnick ranch purchase—15,000 acres for $11 million
http://www.sierranevada.ca.gov/docs/434sum.pdf

http://www.nature.org/aboutus/privatelandsconservation/conservationbuyer/properties/natureorg-buyer-property-data-file-4.xml

Tollhouse Ranch,California, Kern County
Size: 14,945 acres, Price: $7,475,000

At closing, the buyer will be required to convey to the Conservancy a conservation easement as described below.
…TNC does not currently own the property; however, TNC currently holds an option to acquire the property. Consequently, the opportunity represented by this online posting is contingent on TNC’s acquisition of the property. TNC would also consider the possibility of assigning its option to a conservation buyer.

http://www.nature.org/aboutus/privatelandsconservation/conservationbuyer/properties/tollhouse_ranch_project_location-map.jpg

http://www.dot.ca.gov/hq/transprog/ctcbooks/2011/0511/117_2.5c7_EEM.pdf
$500,000 from CalTrans

Tuesday, October 26, 2010

WCB 11/2010: Calif. Wildlife board to save 84,000 acres in November...

State Plans Big End of Year Land Purchases—over 84,000 acres of land and development rights

Deals include $15 million paid to the Tejon Ranch Company


NOTICE OF MEETING --WILDLIFE CONSERVATION BOARD
November 18, 2010

http://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=24287

MAPS: https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=25149

HIGHLIGHTS:

Heart K Ranch, 880 acre conservation easement, Plumas County

Lower Yuba River, Excelsior, 527± acres, Nevada and Yuba Counties

Bruin Ranch, 1,773± acres, Placer County

Oak Hills Ranch, conservation easement over 3,316 ± acres, Yolo County

Los Vaqueros Ranch Conservation Easement, 800± acres, Monterey County

Santa Clara River Watershed, 123± acres, Ventura County

Tejon Ranch -- conservation easements over 62,003± acres--$15.8 million Kern/Los Angeles Counties

Bottle Peak 418± acres $3.5 million San Diego County

-----------------------------------------------------------------------------------------
SPECIFICS ON AGENDA ITEMS


20. Heart K Ranch $1,090,000 Plumas County
To consider the acquisition of a conservation easement for the Department of Fish and Game over approximately 880± acres for protection of critical habitat for the Sloat Deer herd as well as protection of black oak woodland, montane riparian, and wet meadow habitats, located in the Genesee Valley along Indian Creek in Plumas County.

21. Upper Butte Basin Wildlife Area, Expansion 6 $1,120,000 Butte County
To consider the acquisition of 222± acres of land for the Department of Fish and Game for the protection of wetland habitat, located approximately five miles west of the City of Biggs in Butte County.

22. Lower Yuba River, Excelsior, Phase I, $3,216,440 Nevada and Yuba Counties
To consider the acquisition of 527± acres of land by the Department of Fish and Game (DFG) known as the Yuba Narrows Ranch for protection of deer and mountain lion habitat, located along the Yuba River within the lower Yuba River watershed, situated between the DFG Daugherty Hills and Spenceville Wildlife Areas, in Nevada and Yuba Counties.

23. Bruin Ranch Phase I, $4,515,000 Placer County
To consider the allocation for a grant to Placer Land Trust for a cooperative project with the Department of Fish and Game, Caltrans and Placer County to acquire 1,773± acres of property to protect habitat for threatened and endangered species, including blue oak woodland habitat and approximately three miles of riparian corridor along the Bear River, located in Placer County. Protection of this property will also allow the connection of a regional trail through previously protected land to Placer County's Hidden Falls Regional Park and Coon Creek.

24. Oak Hills Ranch, $2,296,000, Yolo County
To consider the allocation for a grant to the California Rangeland Trust for a conservation easement over 3,316 ± acres of native oak woodlands located south of the community of Dunnigan and north of the town of Esparto in Yolo County.

26. Los Vaqueros Ranch Conservation Easement, $1,210,000.00 Phase II Monterey County
To consider the allocation for a grant to The Nature Conservancy to acquire a conservation easement over 800± acres of property to protect critical steelhead habitat as well as habitat for sensitive wildlife species including the red-legged frog, yellow-legged frog, western pond turtle and intact populations of native fish, oak woodlands, and grasslands on the west side of Salina Valley along the Arroyo Seco River in Monterey County.

27. Santa Clara River Watershed, Totlcom , $2,298,500 Ventura County
To consider the allocation for a grant to The Nature Conservancy, the acceptance of a Recovery Land Acquisition Grant from the U.S. Fish and Wildlife; and the authorization to enter into an Agreement to Subgrant to The Nature Conservancy for a cooperative project with the State Coastal Conservancy, Santa Clara River Trustee Council and the Department of Fish and Game to acquire 123± acres of land for the protection of threatened and endangered species and habitat corridors, located south of the City of Ventura in Ventura County.

29. Tejon Ranch $15,800,000 Kern/Los Angeles Counties
To consider the allocation for five grants to the Tejon Ranch Conservancy to acquire five conservation easements over 62,003± acres for the protection of significant natural landscapes and wildlife linkages and corridors, located south of the City of Bakersfield and north of the City of Los Angeles, adjacent to Interstate 5 and State Highway 138, in Kern and Los Angeles Counties.

30. Bottle Peak $3,562,900 San Diego County
To consider the allocation for a grant to The Escondido Creek Conservancy to assist with the acquisition of 418± acres of property to anchor regional habitat conservation planning efforts, including a Natural Community Conservation Plan, in central San Diego County and provide a critical ecological link between coastal habitat and the higher elevation Cleveland National Forest.

NOTE: PART 2 OF THE AGENDA IS IN NEXT POST

Thursday, September 9, 2010

Water for nature, farms or developers?--legal fight in SJ Valley

More Lawsuits threaten Tejon Ranch sprawl's water supply

excerpted from:
http://www.fresnobee.com/2010/09/05/2066738/chinatown-ii-wells-go-dry-water.html

9/5/2010--A story worthy of Hollywood will soon unfold in California courtrooms -- allegations of government corruption and corporate greed to rival the infamous Los Angeles water grab that inspired the film "Chinatown."

Call it "Chinatown II," a tale beginning 15 years ago -- when, according to lawsuits filed in the last three months, the state illegally turned over the publicly owned Kern Water Bank to an agency controlled by giant corporations in a backroom deal.

Filed by the Tucson, Ariz.-based Center for Biological Diversity, Northern California water districts and a fishing group, two lawsuits seek a court order putting the bank back in state hands. They allege the water bank is controlled by two corporations -- Roll International, owned by billionaire Beverly Hills businessman Stewart Resnick, and Tejon Ranch Co., one of the largest private landowners in California.

A third lawsuit, which includes the Kern water districts, asks the court to stop pumping from the water bank and require further analysis to determine how much water can be pumped without drying up neighboring wells...

...Gaylord Beeson won't forget the Kern Water Bank or July 29, the day his productive water well went dry. Nor will the 32 northwest Bakersfield customers in his small water association.

He blames heavy pumping by his neighbor, the water bank. The water table has dropped 115 feet in the last three years -- something that in the past would have taken two decades....

...Water levels in Rosedale are the lowest since the district was formed in 1959...

...Resnick's Paramount Farms controls 58% of the water bank through property ownership in Westside Mutual Water Co. and Dudley Ridge Water District, the lawsuits say.

Through continuing farmland purchases, Paramount owns 120,000 acres, company officials say, making Resnick one of the biggest farmers in the state.

Tejon Ranch controls another 26% in the same way, the lawsuits say. The company plans the state's largest development -- Tejon Mountain Village, nearly 3,500 homes, dining, shopping and other amenities in the Tehachapi Mountains of southern Kern County.

Barry Zoeller of Tejon Ranch Co. disputes the lawsuits, saying his firm is a minor player with only 2% control of the water bank. The company controls only the Tejon-Castac Water District, he said.

But the legal action says Tejon Ranch also is the majority landowner in the Wheeler Ridge-Maricopa Water District, which controls 24% of the water bank....


--------------------------------

Meanwhile, Landowners fight over San Joaquin River Restoration's Impacts on their Water Rights

excerpted from: http://www.fresnobee.com/2010/08/28/2056901/suit-targets-effects-of-san-joaquin.html#storylink=mirelated#ixzz0z3TnI0cw

8/28/2010--The first lawsuit in the San Joaquin River restoration has been filed by a west-side Valley farming family, claiming the replenished flows are damaging 13,000 prime acres, buildings and crops.

The Wolfsen family -- which includes the Skinner and Mueller families -- says the river has flooded, eroded and seeped into fields east of Los Banos.

A dollar amount for damages is not included in the case, which was filed Thursday in the U.S. Court of Claims in Washington D.C. An amount would be determined as the case proceeds.

A Wolfsen spokesman said the family is not trying to stop the long-awaited restoration, which began in October, more than 20 years after environmentalists sued to return water and salmon to the dried San Joaquin.

"This is a very narrowly focused lawsuit," Wolfsen spokesman Larry Harris said. "We want to preserve property and water rights."...

----------------------------

Will the Governor's New Reservoir plan evaporate more water than would be saved?


http://restorethedelta.org/?p=539

9/4/2010--As one veteran observer commented, “It’s never too early to form a JPA for an evaporation pond.” Meaning this may not be a wise place to store water.
The proposed Sites Reservoir is about 10 miles west of Maxwell in Northern California, on the east side of the Sacramento Valley. The Northern California Water Association (NCWA) says that Sites would be filled primarily by pumped diversions from the Sacramento River during peak flows in winter....

A reservoir at Sites was considered, and shelved, in 1970. DWR had looked at projected evaporation on another reservoir in the same location (Paskenta-Newville Reservoir) and reported that given the air temperature and winds off the backside of the coastal hills, Sites Reservoir would lose more in evaporation than it would make available for use elsewhere.

According to DWR Bulletin No. 73-1, evaporation at this location in the decade from 1960-1970 ranged from 73 to 96 inches a year. That’s 6-8 feet of water that would never make it to a crop (or a tap).

And that’s at last century’s temperatures, not the higher temperatures projected for this century.

Some knowledgeable people think this is actually a way to get water from the Eel River (despite Wild and Scenic Rivers Act protections) and make it available for the Central Valley and Westlands Water District.

Coincidentally, Thad Bettner, general manager of GCID (backers of the Sites reservoir), used to be the resource manager for Westlands Water District.

Sunday, August 22, 2010

Everyone's suing Tejon Ranch, it seems....

Tejon's Wildlife Corridor Cutting Project faces massive legal maze

---straight from their own stock disclosure filings:

--also, Tejon's financial partners in 20,000 home "Centennial" project in L.A. County have pulled their cash out

excerpted from
http://www.faqs.org/sec-filings/100806/TEJON-RANCH-CO_10-Q/
TEJON RANCH CO - FORM 10-Q - August 6, 2010

On October 5, 2009, the Kern County Board of Supervisors granted entitlement approval for Tejon Mountain Village, or TMV. On November 10, 2009, a group consisting of the Center for Biological Diversity, or CBD, Wishtoyo Foundation, Tri-County Watchdogs and the Center on Race, Poverty and the Environment filed an action in Kern Superior Court under the California Environmental Quality Act, or CEQA, against Kern County and the Kern County Board of Supervisors, or collectively, the County, concerning the County’s granting of approval for TMV, including the certification of the Environmental Impact Report, or EIR, approval of associated General Plan amendments, adoption of associated Zoning Maps, adoption of Special Plan No. 1, Map 256, exclusion from Agricultural Preserves Nos. 4 and 19, and approval of Vesting Tentative Tract Maps 6720 and 6717, among other associated approvals. TMV is named as the Real Party in Interest in the action.

The action alleges that the County failed to properly follow the procedures and requirements of CEQA including failure to identify, analyze and mitigate impacts to air quality, biological resources, hydrology and water quality, traffic, cultural resources, hazards, and failure to adequately describe the project and the environmental setting. The action also alleges that the County violated the Planning and Zoning Law and the Kern County General Plan.

The Company believes the EIR sufficiently addresses all environmental impacts of the project. As the developer and beneficiary of the County EIR approval, the Company is actively involved in supporting the County as it defends the approval of the project. The case is expected to be heard by the Kern Superior Court in 2010. If the plaintiffs do not prevail in their initial action, it is expected they would appeal the decision. The Company intends to provide financial support to the County in defense of their decision.

-------------------------------

On November 10, 2009, an additional suit was filed in Federal Court by an alleged representative of the Kawaiisu Tribe alleging that the Company does not hold legal title to the land within the TMV development that it seeks to develop. The grounds for the federal lawsuit were the subject of a United States Supreme Court decision in 1924 where the United States Supreme Court found in favor of the Company.

-------------------------------

On February 10, 2010, an individual and a related limited liability company, (collectively “Burrows”), filed a lawsuit in Los Angeles County regarding the allocation of certain water, land and entitlement processing rights as between Burrows, Tejon and Tejon’s partners for the Centennial project in Los Angeles County. The lawsuit arises from and relates to a 2006 settlement agreement between Burrows and the Company involving a land swap, water rights and entitlement processing requirements relating to Centennial and certain properties owned by Burrows in the immediate vicinity of the Centennial site.

A previously issued temporary restraining order was dissolved by the judge assigned to the Burrows lawsuit. The case is still in the preliminary pleading stage. The Company and Centennial Founders LLC are aggressively defending this lawsuit. The Company has secured the services of an outside law firm to litigate this claim. Given the preliminary nature of this lawsuit, the Company has an insufficient basis to address the merits or potential outcomes of the Burrows lawsuit. The monetary value of a potential adverse outcome on the claim likewise cannot be estimated at this time.

-------------------------------------

The Company leases land to National Cement Company of California Inc., or National, for the purpose of manufacturing Portland cement from limestone deposits on the leased acreage. The California Regional Water Quality Control Board, or RWQCB, for the Lahontan Region has issued several orders with respect to environmental conditions on the property currently leased to National:

(1) Groundwater plume of chlorinated hydrocarbon compounds. This order directs the Company’s former tenant Lafarge Corporation, or Lafarge, the current tenant National, and the Company to, among other things, clean up groundwater contamination on the leased property. In 2003, Lafarge and National installed a groundwater pump-and-treat system to clean up the groundwater. The Company is advised that Lafarge and National continue to operate the cleanup system and will continue to do so over the near-term.

(2) Cement kiln dust. National and Lafarge have consolidated, closed and capped cement kiln dust piles located on land leased from the Company. An order of the RWQCB directs National, Lafarge and the Company to maintain and monitor the effectiveness of the cap. Maintenance of the cap and groundwater monitoring remain as on-going activities.

(3) Former industrial waste landfills. This order requires Lafarge, National and the Company to complete the cleanup of groundwater associated with the former industrial waste landfills. The Company is advised that the cleanup is complete. Lafarge continues to monitor the groundwater.

(4) Diesel fuel. An order of the RWQCB directs Lafarge, National and the Company to clean up contamination from a diesel fuel tank and pipeline. The Company is advised that Lafarge and National have substantially completed the groundwater cleanup and that groundwater monitoring remains an on-going activity.

To date, the Company is not aware of any failure by Lafarge or National to comply with the orders or informal requests of the RWQCB. Under current and prior leases, National and Lafarge are obligated to indemnify the Company for costs and liabilities arising directly or indirectly out of their use of the leased premises. The Company believes that all of the matters described above are included within the scope of the National or Lafarge indemnity obligations and that Lafarge and National have sufficient resources to perform any reasonably likely obligations relating to these matters. If they do not and the Company is required to perform the work at its own cost, it is unlikely that the amount of any such expenditure by the Company would be material.

-------------------------------

On November 29, 2004, a complaint was filed by the County of Los Angeles asking for the Antelope Valley ground water basin to be adjudicated. This means that the rights of all parties overlying the basin, including the Company’s land, should be fixed based on various principles of water law and on negotiations among the principal parties or groups of water users. Because the case is still in the early stages and not at issue, it is too early to ascertain what effect, if any, this case may have on the Centennial project or the Company’s remaining lands in the Antelope Valley. Because the water supply plan for the Centennial project includes several sources of water in addition to ground water underlying the Company’s lands, and because the creation of an efficient market for local water rights is frequently an outcome of adjudication proceedings, we anticipate that sufficient water to supply the Centennial project’s needs will continue to be available for its use.

-----------------------------------
On May 12, 2010, the Attorney General, on behalf of the State Water Resources Control Board, filed a complaint in the Alameda County Superior Court for civil penalties and a permanent injunction against TravelCenters of America LLC, or TA, facilities in the Central Valley of California. The travel centers in the Petro Travel Plaza Holdings LLC, or TA/Petro, were also included in the complaint. The lawsuit claims violations of various paper reporting, operating and UST monitoring prevention laws. In addition to the TA/Petro entity and its respective member entities, the lawsuit also names the Company and Tejon Industrial Corporation. The Company has tendered defense of the lawsuit to TA, under the “defend and indemnify” clause in the LLC’s operating agreement, and has also secured the services of an outside law firm to work with TA’s outside counsel under a joint defense agreement. Counsel for TA and the Company are working together to attempt to change the venue of the lawsuit to Kern, or another Central Valley, County, and to dismiss the Company and TIC, as well as other TA entities, from the lawsuit. Given the preliminary nature of this lawsuit, the Company has an insufficient basis to address the merits or potential outcomes of the lawsuit. The monetary value of a potential adverse outcome on the claim likewise cannot be estimated at this time.

-------------------------------
On June 3, 2010, Central Delta and South Delta Water Agencies and several environmental groups, including CBD, filed a complaint in the Sacramento County Superior Court against the California Department of Water Resources (DWR), Kern County Water Agency and a number of “real parties in interest,” including the Company and Tejon Castac Water District, or TCWD. The lawsuit challenges certain amendments to the State Water Project contracts that were originally approved in 1995, known as the “Monterey Amendments.” The original EIR for the Monterey Amendments was determined to be insufficient in a lawsuit, and the current lawsuit challenges the remedial EIR that DWR prepared as a result of the original lawsuit. Among other legal allegations, the current lawsuit challenges the transfer of the Kern Water Bank, or KWB, from DWR to Kern County Water Agency and in turn to various Kern County interests, including TCWD which has a 2% interest in the KWB. A parallel lawsuit was also filed against Kern County Water Agency, also naming the Company and TCWD as real parties in interest. The Company is named on the ground that it “controls” TCWD. TCWD has a contract right for water stored in the KWB and rights to recharge and withdraw water. Counsel for the Company is considering a dismissal of the Company from these lawsuits. Given the preliminary nature of these lawsuits, the Company has an insufficient basis to address the merits or potential outcomes of the lawsuit. The monetary value of a potential adverse outcome on the claim likewise cannot be estimated at this time.

NOTE E – INVESTMENT IN UNCONSOLIDATED JOINT VENTURES

The Company maintains investments in joint ventures. The Company accounts for its investments in unconsolidated joint ventures using the equity method of accounting unless the venture is a variable interest entity, or VIE, and meets the requirements for consolidation. The Company’s investment in its unconsolidated joint ventures at June 30, 2010 was $47,020,000. The equity in the earnings of the unconsolidated joint ventures was $13,000 for the six months ended June 30, 2010. These joint ventures have not been consolidated as of June 30, 2010, because they are not VIEs and the Company does not control the investments. The Company’s current joint ventures are as follows:

•Petro Travel Plaza Holdings LLC – TA/Petro is an unconsolidated joint venture with Travel Centers of America, LLC for the development and management of travel plazas and convenience stores. This is a 60%-owned joint venture which owns and operates travel plazas/commercial highway operations in TIC. It houses multiple commercial eating establishments as well as diesel and gasoline operations. The Company does not control the investment due to its having only 50% voting rights, and because our partner in the joint venture performs the day-to-day operations at the facility. At June 30, 2010, the Company had an equity investment balance of $9,014,000 in this joint venture.

•Tejon Mountain Village LLC – Tejon Mountain Village LLC is an unconsolidated joint venture between the Company and DMB TMV LLC (a wholly owned subsidiary of DMB Associates, Inc.) formed to obtain all necessary government entitlement approvals and to develop the Tejon Mountain Village project. The Company owns a 50% interest in this venture. At June 30, 2010, the Company’s equity investment balance in this joint venture was $28,114,000.

•Rockefeller Joint Ventures – The Company has two joint ventures with Rockefeller Group Development Corporation for the development of buildings on approximately 91 acres. These joint ventures are part of an agreement for the development of up to 500 acres of land in TIC including pursuing Foreign Trade Zone, or FTZ, designation and development of the property within the FTZ for warehouse distribution and light manufacturing. The Company owns a 50% interest in each of the joint ventures. Currently the Five West Parcel LLC joint venture owns and leases a 606,000 square foot building. The second of these joint ventures, 18-19 West LLC, was formed in August 2009 through the contribution of 61.5 acres of land by the Company, which is being held for future development. As of June 30, 2010, the Company’s combined equity investment balance in these two joint ventures is $9,892,000.

• Centennial Founders LLC – Centennial Founders LLC is a joint venture with Pardee Homes, Lewis Investment Company, and Standard Pacific Corp. that was organized to pursue the entitlement and development of land that the Company owns in Los Angeles County. The Company had a 50% ownership interest in this joint venture until July 1, 2009 when a change in the joint venture operating agreement resulted in the Company becoming the sole funding partner and satisfying the requirements for controlling the joint venture.

Consequently, the operating results of Centennial Founders LLC were consolidated effective July 1, 2009. Despite this change our partners continue to be involved in an advisory capacity and may re-elect contributing status at a later time by contributing their pro rata share of capital in future capital calls. At June 30, 2010 the Company had a 60.94% ownership position in Centennial Founders LLC. Our partners retained a non-controlling interest in the joint venture.

Friday, July 9, 2010

Tejon Ranch stock is in the toilet....

-
The Condor's revenge?

Editor's note: a little over 2 years ago, after Tejon made a deal with 5 groups to not oppose their developments, the company's stock was trading at $45 a share. Times change...

http://www.learningmarkets.com/News-Feed/2010070929155/tejon-ranch-co-drops-to-52-week-low-trc-vno-loop.html

Friday, 09 July 2010 03:24 Tejon Ranch Co. (TRC) [Chart - Analysis - News] established a new 52-week low yesterday at $22.90. Clearly investors are not enthusiastic about the firm's prospects. The decline was accompanied by higher than average volume, which adds to the momentum behind yesterday's move.

Thursday, February 4, 2010

both sprawl and oil drilling make quite a mess...

Enviro deal-cutters get a lot of heat


2-4-2010--(This comes from a blog written by Gary Patton, who has been an attorney for the Planning and Conservation League, and represented them when they cut a deal with the Tejon Ranch developer.) Here, he debates the attorney for the Santa Barbara-based Environmental Defense Center, which cut a deal over oil drilling. As I've posted before, both deals have upset a lot of people and have caused quite a backlash.


http://www.gapatton.net/2010/02/35-exchange-of-correspondence.html

-----------------------------
This is the comment I posted:

Gary,

this is like the pot calling the kettle black. The deal you cut for Tejon Ranch was shrouded in secrecy too. As a longtime Sierra Club member and 5 year executive committee member at the Angeles chapter, many of us were sandbagged by the leadership's sudden announcement of the "deal", which was then "ratified" in an unpublicized vote shoved in front of the ex-com with no notice to the grassroots and no opponents present. The PCL and NRDC and EHL and Audoubon didn't broadcast this deal to their members either before signing on the line.

In comparison to the Tranquilon Ridge deal, the Tejon project will encourage the merging of the L.A and Bakersfield sprawl--a pretty scary outcome. I understand you think this is the best deal you could make. But sometimes, it's better to walk away from a crummy deal than forever tar your organization's reputation among the grassroots activists. Of course, if your organization doesn't care about the grassroots, and chases the corporate contributions, and is well-known for cutting deals with developers and polluters like NRDC and EHL and Audubon, then maybe this loss of reputation does not matter to you. Since the deal was signed, your group's names have figured prominently in Tejon Ranch's TV ads. I've seen it so many times before: when you work with the other side, their propagandists will make use of your good standing with the public everywhere they can.

I am not writing this to support the Tranquilon ridge deal. I don't support it. But I at least understand why they cut it, as this is right in their backyard and they have worked and fought over this issue for many years. On the other hand, the groups who sold out to Tejon Ranch have very little history of fighting this development, are not based anywhere near the project and have enraged all the local groups who have to live with its impacts. When corporate enviro groups walk into local battles and cut a deal and leave, they may not collect money directly from the developer, but I'll bet the big corporate donations pour in from other enviro-wreckers who want that group's support or wink-wink "non-opposition" for their latest project. It's a slippery slope the Tejon-friendly groups are on. Now that grassroots folks know who they play ball with, we'll never give them another dime.

I respect some of the work PCL has done in the past. But you made your bed this time.

Rex Frankel, editor, Rare Earth News

Monday, December 7, 2009

train, train, go away, leave wildlands alone we say...

-
Court Rules Against Super-train Route


From the PCL: On Thursday 12/3/2009, the California High Speed Rail Authority rescinded its poor route choice for the Central Valley-Bay Area segment of the state's proposed high-speed train network. This decision means that the Authority will re-evaluate other potential routes into the Bay Area that would have fewer negative environmental effects and less impact on nearby communities. Last year the Planning and Conservation League, along with BayRail Alliance, California Rail Foundation, Transportation Solutions Defense and Education Fund, and the cities of Atherton and Menlo Park filed a lawsuit challenging the Authority's decision to route the train through the Pacheco Pass and along the Peninsula to San Francisco . The group noted that the Authority had not adequately reviewed the project and failed to sufficiently consider other routes for the Central Valley-Bay Area segment. The courts agreed and sent the Authority back to the drawing board to do it right. Today's decision is good news for high speed rail. First, by building the train to ensure minimal impacts to the environment and local communities, the Authority can stem the growing tide of opposition - increasing the chances that the project will actually be built. Second, by exploring the full range of alternative approaches at the outset, the Authority will save substantial time and money in the long run - again improving the project's likelihood of success. However, Thursday's decision will only be meaningful if the Authority conducts a real review and commits to choosing the most effective route. To date, the Authority's leadership has been more motivated by political pressure than sound public policy. We hope yesterday's announcement finally puts high speed rail development on the right track.

http://www.sfgate.com/cgi-bin/article.cgi?f=/c/a/2009/12/04/BAHR1AUL1F.DTL

(12-04) 04:00 PST Sacramento - -- Efforts to link the Bay Area and the Central Valley by high-speed rail pulled onto a bureaucratic siding Thursday as the High Speed Rail Authority rescinded its approval of an environmental study for that section of the bullet train.
The unanimous rescission of the 2008 approval, which identified the Pacheco Pass as the preferred route, was in response to an August court ruling that the environmental document was partially inadequate. Parts of it will need to be redone. But how long it will take to fix the study, and move forward with the choice of an alignment between San Jose and Merced, is a matter of controversy. Rail authority officials say it should take a few months - at most. But an attorney representing an environmental group, which joined with Atherton and Menlo Park in filing the suit, says the study shouldn't be rushed. "It's very clear to us that you need to understand that there may be environmental impacts, impacts on habitat and growth impacts that could be avoided if you did things differently," said Gary Patton, special counsel for the Planning and Conservation League, which joined in filing the suit. Patton estimated it could take as long as a year to reconsider the study properly; and any rushed study, he said, would likely lead the sides back to court. The groups involved in the lawsuit objected to the authority's selection of Pacheco Pass over Altamont Pass as the gateway to the Bay Area, and still consider it a superior choice, Patton said outside the meeting. He said the groups want the authority to completely reconsider their decision, which could steer them toward Altamont.

http://cahsr.blogspot.com/2009/11/hsr-should-go-where-people-are.html

mentions Tejon Ranch--in relation to the Super-train project

Thursday, November 12, 2009

Mega lawsuit against Mega-Tejon paving project...


New Groups Join Fight to Save Tejon Ranch
--Suit Filed to Stop Luxury Sprawl Megadevelopment

http://www.biologicaldiversity.org/news/press_releases/2009/tejon-ranch-11-12-2009.html

11/12/2009--BAKERSFIELD, Calif.— A coalition of endangered species advocates, Native Americans, environmental justice advocates, and local residents filed suit today to overturn Kern County’s approval of the controversial Tejon Mountain Village resort development on Tejon Ranch, California. The growing opposition is drawn together by concern for the California condor, the sacred sites of the Chumash people, air quality degredation, and decreased quality of life for current residents if the sprawl complex is built.

The development of luxury homes, golf courses, and hotels would destroy critical habitat of the iconic and severely endangered California condor and would potentially derail the most expensive species-recovery effort ever attempted. The project would add significant air pollutants and greenhouse gases to an area that already suffers from the worst air pollution in the country. It would rely entirely on water unsustainably imported from the State Water Project, and is sited on top of two of the largest earthquake faults in the country – as well as in an area known for catastrophic and deadly wildfires.

The suit was filed under the California Environmental Quality Act in Kern County Superior Court in Bakersfield by the Center for Biological Diversity, Wishtoyo Foundation, TriCounty Watchdogs, and the Center on Race, Poverty, & the Environment. Final environmental-review documents were approved by the Kern County Board of Supervisors on October 5, 2009.

“All of California will suffer if this project gets built – more water will be stolen, the bird that graces our quarter will be doomed, our air will get dirtier, and thousands of people will be placed in harm’s way because of earthquakes and wildfires that will inevitably follow – all so Wall Street can make another quick buck,” said Adam Keats, director of the Urban Wildlands Program at the Center for Biological Diversity.

Tejon Ranch Company is heavily invested in by Third Avenue Real Estate Investments (TAREX), a firm that specializes in speculative real estate in environmentally sensitive areas (TAREX is a primary owner of St. Joe in Florida, another hotly contested and destructive development project).

Tejon Ranch, including the area Tejon Mountain Village is planned for, was historically occupied by three different Native American tribes whose land was stolen by the original owner of Tejon Ranch. The condor is one of the most important spiritual symbols to the region’s Native Americans.

“Tejon Mountain Village threatens Chumash village sites and sacred places, which is devastating to Chumash people,” said Mati Waiya, Chumash ceremonial elder and executive director of the Wishtoyo Foundation and its Ventura Coastkeeper Program. “It also threatens our sacred and cultural relationship with the California condor that is depicted in our ancient cave paintings and told in our stories, which have been passed down from generation to generation for more than 10,000 years. It is important that we as Chumash people protect our sacred grounds and our ancestors’ burial sites, and continue our elders’ work from the early ’80s to help bring back the California condor population, from 22 left in the wild to a still-scarce population of more than 140. The cultural impact of this proposed development and the accompanying proposed desecration of Chumash cultural resources and our sacred California condor is, once again, a demonstration of greed and disregard for Native American people and cultures.”

The project, located in the rugged Tehachapi Mountains along the “Grapevine” pass of Interstate 5, would add tremendously to the already overburdened highway – the only road off the mountain in either direction.

“This highway is already maxed out with thousands of cars and trucks – it can’t handle a project of this scale, which would more than double the population of the area,” said Jan de Leeuw of the TriCounty Watchdogs, a local citizen group based in nearby Frazier Park. “If this project goes forward, we’re looking at a traffic nightmare getting even worse, with sprawl development filling in everything from Los Angeles to Bakersfield.”

“Tejon Mountain Village straddles the two worst-performing air districts in the country,” said Brent Newell of the Center on Race, Poverty & the Environment. “Thousands of car trips going in and out of this resort – which we all know will include daily commuters, given its proximity to Los Angeles – will further dirty the air and increase pollution-related health problems of the people who live here.”

Preserving Tejon Ranch as a new national or state park would protect a bounty of native plant and animal communities, cultural and historic features, and scenic vistas. See http://www.savetejonranch.org.

------------------------------


Latest Tejon news stories

http://www.bakersfield.com/news/columnist/henry/x2067559308/LOIS-HENRY-Stop-building-homes-based-on-dream-water

10/3/2009

“That brings reliability down to more like 50 percent, according to some local water district folks I've spoken with.

That's not good enough to base a housing development on, not matter how water-wise it is.”


http://ecoworldly.com/2009/11/13/lawsuit-filed-to-stop-condor-killing-development-save-tejon-ranch/

11/13/2009

http://www.care2.com/news/member/100041282/1302830

http://la.curbed.com/archives/2009/11/tejon_got_servednew_lawsuit_for_mega_project.php

11/12/2009

http://www.bakersfield.com/news/local/x1816604894/Groups-sue-over-Tejon-development

11/12/2009

http://topics.treehugger.com/article/07CYcEQa5mbky?q=%22urban+planning%22+OR+%22city+planning%22+OR+%22urban+design%22+OR+%22city+design%22+OR+%22town+planning%22+OR+sprawl++

http://www.biologicaldiversity.org/news/press_releases/2009/tejon-ranch-11-12-2009.html

11/12/2009

http://www.biologicaldiversity.org/campaigns/save_tejon_ranch/index.html

http://www.bakersfield.com/opinion/letters/x1260873660/Board-is-for-sale

the Kern Board of Supervisors is for sale

10/21/2009

http://www.bakersfield.com/news/local/x1722027440/Lawsuit-likely-after-supervisors-approve-Tejon-project

10/6/2009

http://www.biologicaldiversity.org/news/center/articles/2009/bakersfield-californian-10-06-2009.html

10/6/2009

http://people.bakersfield.com/home/Blog/Jburger/50235

10/3/2009

http://www.bakersfield.com/news/local/x2067559225/Form-letter-e-mails-flood-county-supervisors-boxes

10/2/2009

http://mountainenterprise.com/atf.php?sid=5733&current_edition=2009-10-02

“Master Builders and Development Poker”

10/5/2009

http://www.care2.com/news/member/100041282/1264913

photos of condors

http://leblog.exuberance.com/2009/10/save-tejon-ranch.html

pretty wildflower picture

----------------------------------

http://www.wind-watch.org/alerts/2009/10/02/wall-street-will-be-killing-many-condors/

text and maps of wind power’s impacts on condors

http://www.wind-watch.org/news/2009/10/02/condor-killing-development-company-receives-governor%E2%80%99s-conservation-award/

-------------------------------------------

http://people.bakersfield.com/home/Blog/noholdsbarred/51595

11/7/2009—is there an Indian tribe working with Tejon Ranch company to open a casino?

http://mountainenterprise.com/atf.php?sid=5969&current_edition=2009-11-06

more on one Tejon tribe seeking a casino

http://www.kget.com/news/local/story/17-News-Special-Report-Betting-on-Bakersfield/JxUUIICIHUOxOIl7SW58eQ.cspx

http://math-lesson-plans-online.blogspot.com/2009/10/tribe-challenges-tejon-ranch.html

tribe challenges Tejon Ranch’s ownership of the Ranch

http://people.bakersfield.com/home/Blog/Jburger/50156

10/1/2009

http://snooperazzi.com/index.php?/SnoopMobile/ca-tribe-challenges-tejon-ranch-development.html

http://www.bakersfield.com/news/local/x746311556/Tribe-elder-challenges-Tejon-project

9/30/2009

http://mountainenterprise.com/atf.php?sid=5715&current_edition=2009-09-25

http://www.youtube.com/watch?v=htBTd-O9Gu0

for a video on this

http://video.aol.co.uk/video-detail/ca-tribe-challenges-tejon-ranch-development/4170099565

http://www.ireport.com/docs/DOC-335812

http://mountainenterprise.com/atf.php?sid=5635&current_edition=2009-09-18

9/18/2009

---------------------------------------------

http://ecoworldly.com/2009/10/02/condor-killing-development-company-receives-governors-conservation-award/

Schwarzenegger pats Tejon Ranch corp. on the back

10/2/2009

Good aerial photo

http://www.reuters.com/article/pressRelease/idUS158285+01-Oct-2009+BW20091001

more on the goobernator

http://articles.latimes.com/2009/sep/27/opinion/oe-rosenberg27

America needs more 'crown jewels'--Tejon should be a national park

9/27/2009

http://.newnationalparks.org

-----------------

http://people.bakersfield.com/home/Blog/deleeuw/50526

on the original ranchwide agreement

10/11/2009

http://www.cuddyvalley.org/blogs/nimby/?p=395

---------------------------

http://mountainenterprise.com/atf.php?sid=5805&current_edition=2009-10-02

Kern Planning commission limits size of Frazier Park Estates to 188 homes; they had sought 662 homes

10/8/2009

http://people.bakersfield.com/home/Blog/Jburger/50440

blow-by-blow coverage of the hearing

-------------------------------------------------------------------------------------------------

Balderdash!, Jack.

3500 lots means nothing to speculators without the water and roads and geology studies and endangered species act exemptions etc that they'd need to get away with anything on the land. Those speculators would go broke against the lawsuits that would be thrown against them.

You underestimate the anger of the grassroots environmental community in California. We are going to rain hellfire on this project in the courts. The sellout groups mean absolutely zip. As a veteran of taking on battles termed a lost cause by the corporate eco groups and bankrupting our opponents (at the Ballona Wetlands in L.A.), I know how much difference the real environmentalists can make.

This battle is only just beginning....

http://www.cuddyvalley.org/blogs/nimby/?p=395&cpage=1#comment-3292

----------------------


Wednesday, September 30, 2009

Tejon condor concreting will be decided this Monday...

-
UPDATE: Kern County Supervisors Unanimously Rubber-stamp Tejon Mountain development


read the blow-by-blow from the Bakersfield Californian: http://people.bakersfield.com/home/Blog/Jburger/50267

Imagine these hills along the I-5 and Grapevine covered in 3400 homes, plus another 25,000 nearby, all in fragile endangered species habitat along the San Andreas and Garlock earthquake faults! SAVE TEJON RANCH!
-

Monday October 5th is Showdown for Sprawl Pavers v. Open Space fans, Drivers, breathers and critters


Will the sprawl of L.A. merge with the sprawl of Palmdale and the sprawl of Bakersfield?

Tell Kern County's Board of Superviser's NO!

WHEN: 9 A.M., Monday October 5th
1115 Truxtun Avenue
Bakersfield, CA 93301 - 4617

E-Mail your opposition to the Tejon Mountain Village development to:
clerkofboard@co.kern.ca.us

You can also watch the hearing here:
http://kern.granicus.com/ViewPublisher.php?view_id=2

Plus--all the staff reports are here: http://www.co.kern.ca.us/planning/pubntces.asp


Map borrowed, (and sprawl outlines added) from http://www.cuddyvalley.org/blogs/nimby/?p=392

Sunday, September 6, 2009

Sept 10 is First Big Hearing on Tejon development...

-

UPDATE: The Kern County Planning Commission has approved Tejon's Mountain Village project by a 3 to 2 vote. The County Supervisors will hear the project on October 5th


----------------------------------

First Big Public Hearing on Plan to Develop 10% of Tejon Ranch

http://mountainenterprise.com/atf.php?sid=5396&current_edition=2009-07-31

A public hearing is slated for September 10 before the Kern County Planning Commission (1115 Truxtun Avenue, Board of Supervisors chambers at 7 p.m.) in Bakersfield for Tejon Mountain Village, 3450 homes surrounding Castac Lake along the 5 Freeway east of Frazier Park.

-------------------------

Wonder What 3450 Homes in an Eco-Paradise Looks Like?

According to the developer's pictures, they are invisible!!

FIGURE 4.1-7B from Tejon Mountain Village Draft EIR as seen from "viewpoint 2a";

"Viewpoints 2 and 2a would provide views to the
greatest amount of physical changes....overall there would be little change in views." DEIR page 4.1-16

(Click on image to enlarge)

---------------------------------------------------------------

TRC was only planning to develop 5% of their ranch anyway…(see page 2 of their 2005 newsletter)

So the threats to develop more (claimed by some eco groups in 2008 as why they cut the deal) are bogus

http://www.tejonranch.com/data/news/newsletter/Tejon%20Ranch%20Grapevine%20-%20Spring%202005.pdf


COMMENT LETTERS ON TEJON’S CONDOR PLANS:

http://www.mountainenterprise.net/images/TejonRanch/ScientistsCommentTUMSHCP.pdf Comments from Scientists on the TUMSHCP (52 KB PDF)

http://www.mountainenterprise.net/images/TejonRanch/CBDCommentsTejonMSHCP7.7.09.pdf
Comments from the Center for Biological Diversity (5.2 MB PDF)

-------------------

WHERE TO READ ALL OF THE EIR'S

(ALL ARE MASSIVE DOCUMENTS)

http://www.co.kern.ca.us/planning/pdfs/eirs/TejonMountainVillage.pdf

THE COUNTY/TEJON RANCH'S RESPONSES TO COMMENTS ON THE DRAFT EIR:

http://www.co.kern.ca.us/planning/pdfs/eirs/TejonMountainVillage_RTC.pdf

---------

Also, Kern County Planners are tougher on next-door project

8/28/2009

http://www.turnto23.com/south_county/20595804/detail.html

Kern co planning dept recommends only 188 homes at Frazier Park Estates, down from 662 sought by the developer

--“The county has never approved a project built on such steep slopes in its history, according to Lorelei Oviatt of the Kern County Planning department.”

---------------------------------

A COLLECTION OF THIS SUMMER’S NEWS COVERAGE:

SEPTEMBER:

9/4/2009

http://www.bakersfield.com/news/local/x616725528/Massive-Tejon-project-headed-to-first-vote

olanning commission to hear Tejon Mountain Village on Thursday sept 10

------------------------------------

AUGUST:

8/2/2009--Tejon Water Magick

http://www.cuddyvalley.org/blogs/nimby/?p=359

-----------------

8/3/2009

Tejon Ranch asks court to lift gag on negotiations

http://www.bakersfield.com/news/business/growth/x944962870/Tejon-Ranch-asks-court-to-lift-gag-on-negotiations

8/3/2009 TRC press release

http://www.businesswire.com/portal/site/home/permalink/?ndmViewId=news_view&newsId=20090803006213&newsLang=en

--------------------

8/4/2009

http://www.biologicaldiversity.org/news/center/articles/2009/los-angeles-times-08-04-2009.html

Secret Condor Documents Released by Tejon Ranch

Thanks to relentless pressure from the Center for Biological Diversity and growing public outcry, this Monday Tejon Ranch finally acceded to the release of secret documents related to its plans for a destructive megadevelopment known as Tejon Mountain Village. The development is planned for the heart of federally protected habitat for the endangered California condor. To build there, the ranch needs to gain a "take" permit to cover its butt regarding the condor's fate (and the fate of 25 other imperiled plants and animals on the ranch). But negotiations on permits for the development -- and what to do about those pesky 26 species in the way of it -- have been kept under wraps by the ranch and the U.S. Fish and Wildlife Service ever since the ranch sued the Service in an effort to derail the condor's recovery.

The Service kept mum on what was in the files, denying the Center's request for all documents related to Tejon Ranch's pending take-permit application, and heightening concerns about what was so "secret." We formally appealed that denial and warned the Service we'd sue. Now faced with the real threat of a lawsuit, Tejon Ranch has announced it will give up on keeping the documents confidential. But conveniently for the ranch and bad for Tejon's condors, spotted owls, and California red-legged frogs, it's too late for the public to comment on its Tejon Mountain Village plans.

Read more in the Los Angeles Times.

8/4/2009-CBD press release

http://www.commondreams.org/newswire/2009/08/04-7

8/4/2009 CBD press release

http://www.biologicaldiversity.org/news/press_releases/2009/tejon-ranch-08-04-2009.html

-------------------

8/4/2009

http://latimesblogs.latimes.com/greenspace/2009/08/tejon-ranch-co-seeks-release-of-secret-california-condor-documents.html

-----------------------------------

8/4/2009

http://www.the-signal.com/news/article/16423/

-----------------------

8/4/2009

http://ecoworldly.com/2009/08/04/tejon-ranch-companys-development-plans-include-incidental-take-permit-for-california-condors/

8/5/2009

http://rssnews.renewable-energy-sources.com/2009/08/tejon-ranch-company%E2%80%99s-development-plans-include-%E2%80%98incidental-take%E2%80%99-permit-for-california-condors/

A luxury-home subdivision in the heart of designated California Condor habitat?

That’s exactly what Tejon Ranch Company (TRC) has in mind.

In fact, Tejon Ranch Company (TRC) has had it in for the California Condors since at least 1997. That’s when they sued the U.S. Fish and Wildlife Service to prevent the reintroduction of the species into Southern California.

Also links to the Ecoworldly story

8/5/2009—links to Ecoworldly story

http://help4wildlife.wordpress.com/2009/08/05/double-blow-for-ca-condors/

---------------------------------

8/7/2009--Big Greens Ask that Tejon's Condor Gag Order be Lifted

http://mountainenterprise.com/atf.php?sid=5399&current_edition=2009-08-07

“The June 29 letter, signed by Joel Reynolds for the Natural Resources Defense Council and Bill Corcoran for Sierra Club, continues: “...we are writing to urge you to resolve this dispute over public access to information, which is something we all should be able to agree is in the public interest and, more specifically, the best interest of our joint efforts toward conservation of Tejon Ranch.”

-----------------

8/7/2009

http://pinguinus.wordpress.com/2009/08/07/things-fall-apart/

Now that the public comment period is over, suddenly the Tejon Ranch developers are getting all disclose-y. http://www.biologicaldiversity.org/news/center/articles/2009/los-angeles-times-08-04-2009.html

------------------------

8/26/2009

http://www.the-signal.com/news/article/17244/

Lynne Plambeck: Condors and confidentiality

Environmentally Speaking

--------------------------------------------------------------------------

JULY:

7/7/2009

My overriding considerations

http://www.cuddyvalley.org/blogs/nimby/?p=348

----------------

7/7/2009

http://mountainenterprise.com/atf.php?sid=5244&current_edition=2009-07-03

Scientists Submit Opinion on Survival of California Condor Under Tejon Ranch Plan

-----------------

Condor Experts Condemn Proposed Tejon Ranch Development

7/8/2009

http://www.biologicaldiversity.org/news/press_releases/2009/tejon-ranch-07-08-2009.html

7/8/2009—CBD press release

http://www.redrockaudubon.org/other-news/condor-experts-condemn-proposed-tejon-ranch-development/

7/8/2009

http://www.sfgate.com/cgi-bin/article.cgi?f=/n/a/2009/07/08/state/n134715D56.DTL&type=printable

-------------------

7/10/2009, Dry Wells, Student Safety Issues Raised to Trustees,

http://mountainenterprise.com/atf.php?sid=5247&current_edition=2009-07-10

---------------------------------

7/13/2009

http://www.cuddyvalley.org/projects/tmv/tmv_deir.pdf

Tri-County Watchdogs’ comment letter on the TMV DEIR,

-------------------

7/14/2009

http://blogs.laweekly.com/ladaily/environment/no-days-of-the-condor-will-tej/

No Days of the Condor: Will Tejon Ranch Doom the Birds?

Comment by Kristian Cowan

(Rare Earth News received a comment on one of our stories from a Kris that was received from Tejon Ranch Company’s internet server, so it’s possible that the comment critical of CBD on the L.A. Weekly website is from the same person. In both cases, Kris doesn’t reveal her ties to TRC). So consider the source…

-----------------

7/17/2009--

Watchdogs Bite into Tejon Village EIR,

http://mountainenterprise.com/atf.php?sid=5297

-----------------------

7/17/2009

Tejon Ranch’s project in L.A. County: Centennial and Gorman School District Sign $233M Deal to Build Schools

http://mountainenterprise.com/atf.php?sid=5328&current_edition=2009-07-17

“About Centennial
Centennial is planned to be a self-contained, self-reliant community that generates its own economic vitality. The new town will be set in harmony with its environment and fully integrated with housing, jobs, shopping, medical facilities, cultural and recreational amenities and educational institutions. It will not spring up overnight – but will grow organically over 20 years.

Centennial will have approximately 30,000 jobs along with 23,000 homes (12,800 single-family detached homes; 6,200 attached condominiums and townhomes; and 4,000 rental apartments). The homes are designed to be affordable to 74% of those working in the community.”

-------------

7/31/2009

http://mountainenterprise.com/atf.php?sid=5396&current_edition=2009-07-31

Sierra Club and NRDC push TRC to release secret docs…

A public hearing is slated for September 10 before the Kern County Planning Commission (1115 Truxtun Avenue, Board of Supervisors chambers at 7 p.m. in Bakersfield

------------------------

JUNE:

6/2009

LA Magazine story on Tejon

http://www.lamag.com/featuredarticle.aspx?id=16048

------------------

6/5/2009-

http://swiftspeech.blogspot.com/2009/06/tejon-ranch-and-subdivision-of.html

-----------------

6/19/2009

Tejon seeks permit for small building

http://mountainenterprise.com/atf.php?sid=5161&current_edition=2009-06-19#thumb

-------------------

6/19/2009-

http://mountainenterprise.com/atf.php?sid=5125&current_edition=2009-06-19

Gag Order on Secret Condor Documents Targeted by Lawsuit

-----------------------------

6/26/2009

On old plans for development around Castac Lake

http://www.cuddyvalley.org/blogs/nimby/?p=338

------------------

6/26/2009

Kern County Planner unclear on Condor facts

http://www.mountainenterprise.com/atf.php?sid=5176

-----------------------------

6/26/2009

They Tried Before (and Failed)

http://www.cuddyvalley.org/blogs/nimby/?p=338

Plans to build houses around Castac Lake have been around for a long time. Samuel Bishop talked about in 1860, the Holabird appraisal in 1891 talked about it, and Harry Chandler thought about it around 1930. But the first serious plans were proposed in 1972. This resulted in the Tejon Ranch Lake DEIR and Specific Plan.

The project area was 8,100 acres, which includes Castac Lake. Of this 2,800 acres were to be developed, with about 6,000 dwellings. …

---------------------------------------------------------------------------------------------------------------------------

OLDER STORIES, ASSORTED STUFF

6/29/2007

Showdown at Tejon Ranch

http://mountainenterprise.com/atf.php?sid=1106

---------------

http://images.tribe.net/tribe/upload/photo/909/8aa/9098aa23-d318-46fa-a32c-7d4eec26cd60

wildflowers photo

-------------

Tejon Ranch, Ritter Ranch: More Goodbyes to California

Same old same old

http://leblog.exuberance.com/2007/03/tejon_ranch_rit.html

---------------

Photos and biology of Tejon

http://www.environmentnow.org/urban.html

photos from the company

http://www.tejonfilm.com/lakes/lakes.htm

------------------------

More pretty pics

http://www.change.org/actions/view/preserve_tejon_ranch_as_a_new_natural_park

-------------------

Map of the old Ridge Route

http://www.ridgeroute.com/map.html

LA meetuphikes.org

E-Mail the editor:

rexfrankel at yahoo.com

Blog Archive

Quick-Search of Subjects on the Site